Project List for Business

Commercial
Institutional
Mixed-Use
Real Estate Asset Management

Commercial

Mark Scott Construction, Pleasant Hill
Light Industrial Tilt-Up.
Complete project and site management, including leadership of self-performing crews and subcontractors for 16,000 sq. ft. “ground-up” construction. Interface with utilities and jurisdictions. $1.7 million.

345 California, 333 Bush, 100 Bush, 100 Pine, SF
Financial District High Rise Tenant Improvements.
Developed systems to manage 10+ concurrent projects, managed relocation, full-floor build-out, fire-rated elevator corridor, and base building access work. $.1 to 1 million.

PG&E Headquarters, 50 Beal St., SF
Architectural Millwork.
Innovative installation solution for 100 23’ custom, cherry, matched paneling in PG&E Headquarters tower elevator lobby and reception areas. $.6 million.

Clorox ArmorAll R&D Facility, Walnut Creek
Laboratory Remodel and Expansion.
Coordination of multiple projects with ongoing operations in occupied space. Management of leased-space improvements to HVAC, tenant office space, and new heat test chambers. 12% saved on $250,000 budgeted project.

Clorox Headquarters, Oakland
HAZMAT and Tenant Improvements.
Project management and coordination of employee relocations. Subcontracting for Clorox HAZMAT mailroom and multi-floor tenant reconfiguration upgrades. Voice data technology for remodeled floors.

Apple R&D Campus, Cupertino
Architectural Millwork.
Resolved special installation challenges for large-scale prefabricated sections.
Custom wood paneling for reception lobbies and executive offices. $.75 million.

Institutional

Phillip Burton Federal Building, SF
Urban Entry Plaza Hardscape.
Leadership for half-city-block exterior entrance plaza replacement. Created a layout system for innovative design plan (concrete-covered ramps, walls, seating, and tree planters). Produced cost and time efficiencies through scheduling, purchasing, and field supervision. $5.2 million.

Walden House, SF
Seismic Retrofit and Renovation.
Reactivation and project management of long overdue seismic retrofit and renovation to existing 29,000 sq. ft. four-story unreinforced-masonry building (UMB). Steel frames, foundations, and shotcreting for upgrade of existing exterior brick walls. Implemented $700,000 critical scope changes, including fast track scheduling, permit expediting, and coordination of engineers, architects, and contractors for commercial kitchen upgrade. Followed City of San Francisco sustainability ordinances. $3.5 million.

San Francisco Museum of Modern Art, SF
Architectural Millwork and Casework Installation.
Custom seismic reinforcement, fixtures, and paneling for 5,000 sq. ft. bookstore and elevator cabs. $.9 million.

County of Marin Sheriff’s Offices, College of Marin, Kentfield
Modular Offices with Utility Service Hook Ups.
Succeeded in coordinating a challenging and diverse team: county public works roads department, school district, sheriff’s department, campus staff, engineers, and contractors. Created fully functional modular offices.

Grace Cathedral, SF
Exterior Concrete Restoration and Roof Reconstruction.
Intermediary between construction team and Cathedral staff for ongoing operations, Sunday services, pre-planned large-scale. Construction management, including: verification of specifications, systems development, scheduling, project controls, cost tracking, and safety program. Leadership of self-performing labor crews. $3.9 million. Followed City of San Francisco sustainability ordinances.

United States District Court, Northern California
Custom Carpentry and Millwork
Maintained integrity of historic finish work while accommodating mechanical and electrical upgrades in judges’ private chambers. Project followed major seismic upgrade and renovation of this historic San Francisco building.

Mixed-Use

Bayfair Center, San Leandro
Tenant and Capital Improvements.
Coordinated tenant relocations with landlord interior and exterior property redesign programs, In-line, box, and big-box tenants, including Staples, Old Navy, Starbucks, etc.

Coordinated tenant relocations with landlord, interior and exterior property redesign programs, MEP retrofit, life safety, and voice data infrastructure. 1 million sq. ft. $2.2 million.

Bay Street, Emeryville
Tenant and Capital Improvements.
Village-style retail, entertainment, hospitality, and residential venue.

Owner’s representative for entitlements and negotiated contracts of capital improvement program for way-finding, landscaping, parking, site planning, and customer experience enhancements.

Leasing interface on landlord work-letter. Ensured all projects were delivered for tenants on schedule and on budget – all directly related to rent commencement dates and project pro formas. Coordinated new tenant build-outs with minimal disruption for operating tenants, including Old Navy, H&M, and Sephora. Worked with Stopwaste.org on a sustainable landscaping plan and maintenance operations. 1 million+ sq. ft. $2.8 million.

Pier 39 LP, SF
Tenant and Capital Improvements.
#1 Bay Area tourist destination. 200,000 sq. ft. high-occupancy waterfront development, including 110 retail stores, 12 restaurants, and many family-friendly attractions.

Project assessment, development, and implementation for five-year remediation program, mitigating 25 years of deferred maintenance. Managed work on building structure, reroofing, weatherproofing, utilities, infrastructure, and marine construction (sea walls, and pier pilings). Project scope, budgets, specifications, contracts, inspections, invoice processing, and close out. $10 million.

Tenant Coordination.
Owner’s representative. Established improved design criteria and pre-construction procedures. Increased tenant compliance by communicating value of increased end user satisfaction. Regularly directed up to 12 concurrent projects. Served retail/entertainment: NFL/College Shop, Krazy Kaps, Theater 39; restaurants: Bubba Gump Shrimp Company, Hard Rock Café, Crepe Café, Crab House, and Chowders; as well as many other tenants.

Honored for contributions to raised standards in Pier 39 construction and maintenance.

Ralph Lauren Polo Store, SF
Custom mahogany millwork, including paneling, doors, and store display fixtures for landmark company store on Post Street. $1 million.

Louis Vuitton Boutique, Neiman Marcus, SF
Installation of signature custom oak millwork and store display fixture system in high-end occupied retail space. Project required detail modifications to accommodate existing space.

Gucci Boutique, Saks Fifth Avenue, SF
Managed installation of signature, custom high gloss “Gucci White” store display fixture system in high-end occupied retail space.

Asset Management

Community Banks of Northern California
Loan Monitoring and Cost to Complete Reporting.
Assessment, oversight, and reconciliation of over budget Community Bank-financed construction project. Developed schedule of values. Monitored project progress and authorized draws.

Wells Fargo Private Bank Wealth Management Group
1. Development: Light Industrial Land Use Permit and Entitlements. Directed architectural renderings for concept development and approval. Coordinated civil engineering for expanded storm water management system.

2. Fire Damage Estimating: Coordinated peer review estimate, materials replacement, reasonable scenario for claim adjustment request. Result: 20% increased claim payment.

3. Due Diligence Reporting: Assembled report based on consultants’ findings for 20,000 sq. ft. light industrial building, including mechanical, electrical, and plumbing systems, pavement, and roof.

YMCA Properties, SF Bay Area
Physical Needs Assessment.
Initiated six-month program to assess critical and long-term needs of nine Bay Area YMCA properties.

Pacific Meadows Apartments, Carmel
Capital Improvement Program.
Updated report and program for single, two, and three-story residential structures on 10-acre site, perched on a hilltop above beautiful Carmel Valley.



COMMITTED TO PRESERVING OUR ENVIRONMENT