Needing more than a wing and a prayer, Grace Cathedral’s steel reinforced poured-in-place concrete structure was crumbling. Causing spalling fatigue, which allowed moisture to rust the steel. Rusted steel can expand to 16 times its original thickness, forcing concrete to fracture. Chunks were falling off the exterior and even into the sanctuary. More precisely, concrete the size of baseballs was sailing 80+ feet to the ground below. Not good. Especially during the Eucharist and for pedestrians walking along California, Jones, Taylor, and Sacramento.

This is where I came into the picture – as the concrete restoration and roof reconstruction intermediary between the construction team and the Grace Cathedral staff. Holy work.

My Grace Cathedral restoration project management responsibilities included: leadership of self-performing labor crews, large-scale pre-planning, verification of specifications, systems development, scheduling, project controls, cost tracking, safety procedures, scaffolding access for the 174 ft.tall landmark, poured-in-place-roof restoration, standing seam roofing repairs, and compliance with San Francisco’s sustainability ordinances.
The Cathedral sits on the former site of the Charles Crocker mansion, which was destroyed in the 1906 earthquake and fire.
*Photos: Grace Cathedral restoration work. San Francisco, California. Project managed by Craig Beckner.